您的位置:首页 > News > Product Trends

Construction technology and installation method of PPR pipeline

Many owners have such distress, decoration not long, water pipe leakage, floor deformation, furniture has also been bubble In fact, all this is due to the purchase of poor quality pipes and incorrect installation methods. PPR pipeline selection method, here will not repeat. Next, learn the construction technology and installation method of PPR pipeline with Germany BQ!

1、 The following conditions shall be met before installation of PPR water pipe:

1. The construction scheme and drawn technical documents are complete, and the construction requirements and construction supply conditions of pipes, pipe fittings, special hot-melt machines and tools are available.

2. The construction personnel have received the technical training of water supply polypropylene pipe installation.

3. Temporary facilities such as construction land and material storage site, construction water and electricity can meet the construction needs

4. It is not allowed to use pipes and fittings with damage signs. If abnormal quality is found, it should be checked before and after use.

5. During the installation of pipeline system, the opening part shall be blocked in time, and the protection of products on site shall be done carefully. If there is any damage, it shall be replaced in time and shall not be hidden.

6. In winter construction, attention should be paid to the low temperature brittleness of polypropylene pipes.


WeiliTeya

MERCHANTS

地址:Daqiao Industrial Park, Ciwu Town, Zhuji City, Shaoxing City, Zhejiang Province

电话:400-100-2886

邮箱:

微信公众号

X二维码

截屏,微信识别二维码

微信号:

(点击微信号复制,添加好友)

  打开微信

微信号已复制,请打开微信添加咨询详情!